Krishnapatnam Port is currently executing the Phase II development which has an outlay of Rs. 4,000 crores.
 |
|
| |
| Phase II will involve construction of: |
 |
7 additional berths 4 dedicated for Coal, 2 for General Cargo & 1 for Containers |
 |
Mechanised cargo handling system with 13 cargo-wise dedicated railway sidings inside the port |
|
On completion of Phase II, the port will have the following:
Coal Berths
 |
10 dedicated Coal berths with 2 ship unloaders per berth |
 |
Each ship unloader with a capacity of 2,000 TPH |
 |
Conveyor system with a capacity up to 4,000 / 5,000 TPH |
 |
2 wagon loading stations. Each having a capacity to store 2,500 MT and each having a loading capacity of 3,500 MT in 2 hours |
Iron Ore berth
 |
Ship loader with a capacity of 5,000 TPH |
 |
2 Wagon Tipplers of 110 MT capacity, 30 tips per hour per tippler |
 |
2 Stacker-cum-reclaimer with a capacity of 3,000 / 5,000 TPH |
 |
Conveyor with a capacity of 3,000 / 5,000 TPH |
General cargo berths
 |
3 general cargo multipurpose berths |
Rail sidings
 |
13 dedicated cargo-wise rail sidings inside the port with multiple loops for faster evacuation of cargo |
Mechanization
 |
Conveyor system, stackers, reclaimers, ship loaders, ship unloaders and wagon tipplers |
 |
Iron ore loading capacity of 120,000 MT per day |
 |
Coal discharging capacity of 96,000 MT / day |
Pipeline infrastructure
 |
Future provision for dedicated pipelines for various liquid cargos like POL, Chemicals, Bitumen, etc. |
 |
Proposed tank terminal of 1 lakh kilolitres |
 |
Provision for future enhancements |
|
|





|
|
|
|
|
|
|