| Vessel Related Charges |
PORT DUES - USD 0.50 per GRT per call subject to the minimum of USD 1,500 |
PILOTAGE AND TOWAGE |
VESSEL GRT |
CHARGE PER GRT |
Remarks |
Upto 9,999 |
USD 0.57 |
Includes one Berthing & un-berthing.
(Pilotage / mooring boat / mooring crew charges) |
10,000 to 19,999 |
USD 0.56 |
20,000 to 39,999 |
USD 0.55 |
40,000 & above |
USD 0.57 |
|
| |
BERTH HIRE CHARGES |
MINIMUM CHARGES USD 300 PER DAY PER V/L |
USD 0.15
PER GRT PER DAY |
First six hrs - 0.25 day,
06 to 12 hrs - 0.5 day,
more than 12 hrs full day,
charges are applicable. |
|
| |
ANCHORAGE CHARGES |
Outer Anchorage – USD 0.025
Inner Mooring – USD 0.075 |
Per GRT Per Day OR
Part thereof |
Anchorage charges applicable for vessels receiving bunker or carrying out any other operation (as decided by KPCL) at anchorage, but not applicable for vessels waiting for berths. If vessels diverts after arrival, the anchorage charges are applicable.
|
|
| |
SHIFTING – 50% Of the applicable pilotage and towage charges |
WARPING |
CHARGES |
USD 0.15 PER GRT |
Minimum INR 1 lakh charges applicable.
Warping within the same berth. |
|
| |
BERTHING / UN-BERTHING PROCESS CHARGES |
PILOTAGE CANCELLATION CHARGES |
USD 600 |
If cancelled between 2 hrs till pilot boarding. |
USD 2,000 |
If cancelled after pilot boarding. |
PILOTAGE DETENTION CHARGES |
NIL |
First 30 minutes delay from the nominated pilot boarding time. |
USD 1,000 |
Per 30 minutes slab and applicable when delay is more than 30 minutes (for pilot detention - USD 600 + tug detention - USD 1,400 per hour). |
|
| |
LAUNCH HIRE CHARGES |
(TRANSPORTATION FOR PASSENGERS / SHIP STORES ONLY) |
35 BP TO 49 BP -
USD 750 PH |
The charges shall be applicable for minimum 3 hrs.
If used by two different parties, each party to pay the said charges. |
50 BP and above
USD 1,000 PH |
|
| |
ADDL. TUG HIRE CHARGES |
CHARGES |
35 BP TO 49 BP -
USD 1,000 PH |
Tug hire charges for any activity (berthing / un-berthing / shifting / warping / tug assistance at berth) other than personnel transfer. (Applicable per hourly slab). |
50 BP and above
USD 1,250 PH |
|
| |
COLD MOVE CHARGES |
COLD MOVE PER GRT |
Cold move will be carried out only on prior approval. Charges for each process of berthing / un-berthing / shifting will be 4 times the PILOTAGE and TOWAGE charges. Addl. Tug hire charges if any, will be as per Port tariff on an hourly basis. |
Whenever the engine fails during berthing / un-berthing / shifting / warping - It will be treated as a cold move & will be charged at twice the normal pilotage and towage charges. Additional tugs used for the movement will be as per port tariff on an hourly basis. |
|
| |
PENAL BERTH HIRE |
PENAL BERTH HIRE CHARGES |
3 times of the berth hire charges as per the tariff. |
Applicable when vessel is not ready to sail (i.e. Fail to book outward pilot memo) After 2 hours from the time of completion of cargo. |
|
| |
MISC SERVICE CHARGES |
MISC CHARGES |
SECURITY |
USD 25 |
Per calendar day/per guard. |
| GARBAGE |
USD 50 |
Per collection. |
| GANGWAY |
USD 50 |
Per calendar day. |
| HYDRA |
INR 8,000 |
Per 4 hour slab (minimum). |
| SHIP CHANDLING |
INR 5,000 |
Per shipping bill. |
| BOAT CHARGES |
INR 6,000 |
Per each 5 hour slab. |
| FRESH WATER |
USD 5.0 |
Per MT. If supplied through freshwater barges – USD 7.5. |
|
| |
TARIFF FOR EQUIPMENT / GEAR HIRING |
Sr. No. |
Equipment |
Rate |
Remarks |
A |
SHORE CRANE WITHOUT GRAB FOR PART SHIPMENT |
USD 2,000 |
Per 04 hrs or part thereof. |
B |
SHORE CRANE WITH GRAB FOR PART SHIPMENT |
USD 3,500 |
Per 04 hrs or part thereof. |
C |
SHORE CRANE WITH GRAB FOR ENTIRE SHIPMENT |
USD 1.50
PER MT |
|
D |
SHORE CRANE WITHOUT GRAB FOR ENTIRE SHIPMENT |
USD 1.20
PER MT |
(For Loading of Granite Blocks only) |
E |
12 CBM CLAMP SHELL CELCTRO HYDRAULIC GRAB |
INR 30 PER MT |
For the Grabs hired for cargo operations for entire nominated quantity of ship.
In case the Grab is deployed on individual basis
INR 75,000/- per Grab / day. |
F |
12 CBM RADIO REMOTE GRAB (REDUCED SIZE 6 CBM) |
INR 40 PER MT |
For the Grabs hired for cargo operations for entire nominated quantity of ship.
In case the Grab is deployed on individual basis
INR 75,000/- per Grab / day. |
G |
GRAB TRANSPORTATION CHARGES |
INR 15,000
PER GRAB |
|
H |
SHORE POWER SUPPLY |
INR 50
PER UNIT |
|
I |
FRONT END LOADER |
INR 8,000 |
Per 04 hrs or part thereof. |
J |
EXCAVATOR EX - 200/210 |
INR 10,000 |
Per 04 hrs or part thereof. |
K |
EQUIPMENT FOR CARGO SAMPLING |
INR 5,000 |
For Maximum 1 hour |
L |
DELIVERY ORDER REGISTRATION CHARGES |
INR 10,000 |
For each delivery order |
M |
CARGO SHIFTING CHARGES (YARD TO YARD ) |
INR 50 |
Per Metric ton |
N |
WEIGHMENT CHARGES
(DURING SHIFTING) |
INR 25 |
Per Metric ton |
O |
PORT SPECIAL APPROACH ROAD USAGE CHARGES
|
INR 1,000 |
Per CBM / Freight ton which is higher. For the Movement of Project Cargo and Machineries to various construction sites near Port thru. Port approach road not shipped at Port |
|
| |
| Tariff for Wharfage Charges |
Cargo |
INR / mt |
Coal |
30.00 |
Iron Ore |
35.00 |
Minerals |
25.00 |
Granite & Stones |
50.00 |
Fertilisers (Loose bulk) |
35.00 |
Food Grains |
35.00 |
Sugar |
35.00 |
Steel |
50.00 |
Salt |
25.00 |
Cement / Clinker |
35.00 |
Project Machinery |
0.50% of CIF value |
Break Bulk (in any Container form) |
80.00 |
Edible Oil |
80.00 / KL |
|
| |
Port Railway Usage Charges |
| INR 1,300/- per wagon for Rakes handled inside the port siding. |
| |
Railway Haulage Charges |
| INR 1,950/- per wagon. |
| |
Notes:
1. The charges as per above tariff are to be paid in advance
2. The tariff is subject to revision from time-to-time
3. All the charges will be exclusive of all applicable taxes |